Buttelwerth, John.

Computer integrated construction project scheduling / John Buttelwerth. - Upper Saddle River, N.J. : Pearson/Prentice Hall, c2005. - xiv, 482 p. : ill. ; 28 cm.

Includes index. 17 folded schedules and drawings included at the back of the book.

0131114654 (alk. paper)

2004011896


Building--Superintendence--Data processing.
Production scheduling--Data processing.

TH438.4 / .B88 2005

690/.068/5

Epoka University Library, Rr. Tiranë-Rinas,Km. 12 1039 Tirana, Albania
+355 4 2232 086| FAX +355 4 2222 117|library@epoka.edu.al