000 01162cam a22003014a 4500
001 13597484
003 OSt
005 20190430112200.0
008 040518s2005 njua 001 0 eng
010 _a 2004011896
020 _a0131114654 (alk. paper)
040 _aDLC
_cDLC
_dDLC
042 _apcc
050 0 0 _aTH438.4
_b.B88 2005
082 0 0 _a690/.068/5
_222
100 1 _aButtelwerth, John.
245 1 0 _aComputer integrated construction project scheduling /
_cJohn Buttelwerth.
260 _aUpper Saddle River, N.J. :
_bPearson/Prentice Hall,
_cc2005.
300 _axiv, 482 p. :
_bill. ;
_c28 cm.
500 _aIncludes index.
500 _a17 folded schedules and drawings included at the back of the book.
650 0 _aBuilding
_xSuperintendence
_xData processing.
650 0 _aProduction scheduling
_xData processing.
856 4 1 _3Table of contents
_uhttp://www.loc.gov/catdir/toc/ecip0418/2004011896.html
906 _a7
_bcbc
_corignew
_d1
_eecip
_f20
_gy-gencatlg
942 _2ddc
_cBK
955 _ajg12 2004-05-18
_ijg12 2004-05-18
_aaa07 2004-06-04
_aps05 2004-10-04 1 copy rec'd., to CIP ver.
_ajg00 2004-10-08;
_aja15 2006-01-31 copy 2 added
999 _c8274
_d8274